ALVORA GLOBAL FABRICSSurat, India
← All markets
GCC · Saudi Arabia · curtain fabric supplier Saudi Arabia

Contract Curtain Fabric Supplier for Saudi Arabia Hospitality

Saudi Arabia's Vision 2030 programme is delivering the largest single hospitality construction programme in history. NEOM (including The Line and Sindalah island resort), Red Sea Global's luxury eco-resort network, Diriyah Gate, and Qiddiya represent over 100,000 hotel rooms in active development, all requiring FR-certified contract textiles specified to international brand standards. For procurement managers working on these projects, fabric specification is typically finalised 18–24 months before opening, and the supplier shortlist is being built now.

Beyond the giga-projects, Riyadh's premium hotel pipeline, the Jeddah Corniche development, and the Makkah–Madinah hospitality corridor are all driving sustained demand for contract curtain fabric at volumes that European fabric brands cannot supply economically. Surat, Gujarat provides the manufacturing scale, FR certification quality, and English-language documentation infrastructure that these projects require.

The certification landscape in Saudi Arabia is centred on NFPA 701, the US fire standard required by Marriott International, Hilton Worldwide, and IHG, which together operate the majority of international branded hotels in the Kingdom. Red Sea Global and NEOM projects, operating under enhanced procurement standards, typically specify M1 in addition to NFPA 701. The National Civil Defence General Presidency (NCDPG) requires BS 5867 Part 2 as the minimum for all hospitality curtain fabric. Alvora's AGF-BL-01 carries NFPA 701, M1, and BS 5867, satisfying all three requirements with a single product specification.

Logistics run FOB Mundra to King Abdulaziz Port, Dammam, serving Riyadh and Eastern Province projects. Sea freight is typically 12–20 days from Mundra port, depending on vessel schedule and customs clearance. For Red Sea coast and Jeddah projects, Jeddah Islamic Port is the discharge point. Documentation for Saudi customs: original FR laboratory certificates (independent laboratory, not self-declarations), Certificate of Origin (FIEO/EIC), commercial invoice with HS 5903 codes. Dye lot allocation for full project quantities at PO placement ensures colour consistency across phased hotel openings, standard procedure for Vision 2030 multi-phase projects.

Product specifications
SKUProductGSMWidthCertificationsMOQSample
AGF-BL-01FR Blackout Plain290140 cmM1 · NFPA 701 · IMO FTP · BS 58672,000 m7–10 days
AGF-DIM-01FR Dimout220140 cmEN 13773 · B1 · BS 58672,000 m7–10 days
AGF-LIN-01Linen-Look Contract190140 cmBS 58672,000 m7–10 days

Wide-width 280–300 cm available on indent orders of 3,000 m+. NFPA 701 on AGF-BL-01.

Saudi Arabia brand compliance: FR standard required
Hotel brand / project typeFR standard
Marriott International (all brands, KSA)NFPA 701 + M1
Hilton Worldwide (all brands, KSA)NFPA 701
IHG (Holiday Inn, Crowne Plaza, InterContinental)NFPA 701
NEOM / Red Sea Global / giga-projectsM1 + NFPA 701 (confirm with project consultant)
Diriyah Gate, Qiddiya (international flag)NFPA 701 or M1
Independent hotel, NCDPG requirementsBS 5867 Part 2 Type B minimum
Certifications
M1NFPA 701IMO FTPEN 13773BS 5867B1

Original lab test certificates with every shipment.

Logistics: Saudi Arabia
Port of loadingMundra, Gujarat
Dammam (KAP)typically 12–20 days
Jeddah (JIP)Available on request
IncotermsFOB Mundra
HS code5903
DocumentationFR certs · COO · Invoice
Order details
MOQ: 2,000 m per colour
Samples: typically 7–10 business days
Bulk: typically 6–8 weeks production
Request Samples

Trade buyers only · Response within 4 hours